Diaphragm Ties

Remedial Wall Ties for Lateral Restraint (Timber Floor and Roof)

Impact driven through pre-drilled, pre-determined sized pilot holes in the perimeter masonry and through into the second parallel framing timber, or, an embedment depth not less than 75mm into the timber framing end grain at intervals determined by a qualified structural engineer.

Diaphragm Tie Guide & Downloads

Diaphragm Tie Gallery

Crack Repairs

Crack Stitching

Structual Ties

Remedial Wall Ties

Demolition

Screening

Crushing

Recycling

Share This